COMPETITION - FINALIST - 2022 - With Amat Arquitectos + Muñoz Arquitectos

La Rioja

España

ABOUT THE PROJECT

It is a project that is supported by the continuity of movement that, in a symbolic and functional way, allows the coexistence of the three closely related programs to be shaped. It places them under the same building, concentrated and in constant interaction. A single space for research and production. It is a proposal focused on the holistic commitment that relates these industries with the environment. Integrating under this direction the control of its impact on the territory (minimum constructive impact footprint and comprehensive management of waste generated) and the management of the interaction between the different programs that push the evolution of the industry in this direction.

The cyclical recycling process triggers a series of functional and formal logics in the new unified building complex. The circular shape, with continuous movement, builds a dynamic link between the programs to encourage contact, exchange and knowledge spillovers between the different units of the industrial sector. Users, providers, researchers and visitors will find themselves in a flexible and indeterminate space that constantly iterates on its own circular path.

MORE PROJECTS
FRONT_edit
Competition: UTEC Eastern Regional Institute, Minas de Minas
TATU LANZAROTE MUSIC FACTORY 1
LANZAROTE MUSIC FACTORY COMPETITION
Final_01
Casa Pinar B
c192c4_b825e446e7114cbc92758d30be8eea9cmv2
CASA TESTIGO PORTAL DE LUZ
Lago Merin - img frenteC (1)
CASA MERÍN